ODESSA PORT PLANT (OPZ) ACCEPTANCE SIGNED
On April 14, 2010, the ACCEPTANCE CERTIFICATE related to the modification of the Primary Reformer of Ammonia plant II at Yuzhnyj site of OPZ was signed between ODESSA PORT PLANT and CEAMAG. After adjustment of operation parameters, final performance tests were achieved and guaranteed figures accepted. The results showed a slight difference between measured temperature at stack and guaranteed value due to unexpected operating conditions. After analysis by CEAMAG Experts, simple technical solution is proposed. Nevertheless, the overall efficiency of the revamping project has been achieved in agreement with the initial expected goals.
Supply of main equipment and erection works were subcontracted by CEAMAG to its partner FLM.
|
||||||||